    PM Surya Ghar for EPCs: tracking subsidy claims, equipment rules and paperwork

    The scheme pays the customer, but rejected paperwork lands on the EPC. What the subsidy covers, what a vendor must record, and a tracker that stops claims bouncing.

    GC
    GarunaCDX Editorial
    Editorial team
    Oct 19, 2026 4 min read
    Key takeaways
    • Reported subsidy: Rs 30,000/kW for 2 kW, plus Rs 18,000 for the third kW, capped at Rs 78,000. Verify on the official portal.
    • The subsidy goes to the customer, but the EPC's paperwork decides whether it arrives.
    • Equipment rules apply: ALMM-listed modules, and reportedly ALMM List-II cells for projects commissioned on or after 1 June 2026.
    • Record serial numbers and photos at installation, not afterwards.
    • Treat every claim as a pipeline with a status, an owner and a next date.

    Quick answer

    Under PM Surya Ghar the central subsidy is reported as Rs 30,000 per kW for the first 2 kW and Rs 18,000 for the third kW, capped at Rs 78,000, paid to the customer's bank account after commissioning. For an EPC the work is in the evidence: DISCOM registration, compliant equipment, serial numbers and photos, and matching customer data across every upload. Track each claim as its own pipeline from application to payout, and treat a mismatched field as a defect to fix before submission.

    What does the subsidy pay?

    As reported by an EPC-focused guide, the central financial assistance works like this:

    Reported PM Surya Ghar central subsidy by system size (Rs)

    Source: SurgePV EPC guide (vendor source). Verify against the official scheme portal before use.

    View data
    Subsidy
    1 kW₹30,000
    2 kW₹60,000
    3 kW₹78,000
    5 kW₹78,000

    Above 3 kW the subsidy stays at the cap. Larger systems are priced on the customer’s own money beyond that.

    Who gets paid, and what does the EPC do?

    The assistance is reported as a direct bank transfer to the customer after commissioning and the portal claim. The EPC’s job is everything that makes that claim clean: registration, compliant equipment, correct paperwork and accurate uploads. A rejected claim does not just delay the customer’s money. It delays your final payment if your contract ties billing to subsidy.

    What must a vendor have in order?

    From the same guide, as reported:

    • Registration per DISCOM. Each DISCOM you serve has its own vendor registration, with licence, GST and PAN, a local office, a vendor declaration and a security deposit or bank guarantee under its norms.
    • Compliant equipment. Modules on ALMM List-I; inverters BIS-certified; and for projects commissioned on or after 1 June 2026, ALMM List-II cells.
    • Sequence. Feasibility first, installation second.
    • Accurate records. Consumer numbers, serial numbers and bank details must match across uploads.
    • After-sales commitment. The guide says vendor declarations commit installers to free maintenance for five years in most states. Verify for your state.

    On ALMM List-II, trade press reports that MNRE issued a memorandum on 6 July 2026 clarifying applicability. For competitively bid government projects the dates depend on the bid deadline; for projects not awarded by competitive bidding, those commissioned on or after 1 June 2026 generally must comply, subject to approved extensions. Read the memorandum for your project type.

    What should the claim tracker look like?

    Treat each subsidy claim as a pipeline with a status, an owner and a next date.

    StageEvidence to holdCommon failure
    RegisteredConsumer number, state, DISCOM, sanctioned loadWrong DISCOM or category
    Feasibility approvedApproval date and referenceInstalling before approval
    InstalledPhotos, module and inverter serial numbersSerials missing or mistyped
    Commissioning uploadedCompletion report, component detailsUpload does not match the BOM
    Net meter installedInspection and meter datesInspection backlog
    Claim raisedPortal claim referenceBank details differ from the application
    PaidPayout dateChasing without a reference

    Put Waiting on and Days in stage on every row, as in approvals tracking. Capture serials at installation using the method in serial-number and warranty tracking, so the commissioning upload is a copy-paste and not a hunt.

    Where does this not apply?

    Commercial and industrial projects are generally outside this residential scheme, and states run their own incentives. If your work is mostly C&I, your approval and billing logic differs. See billing milestones.

    What to do this week

    1. Take your last five subsidy-linked projects and list which fields differed across forms.
    2. Check each against the equipment rules for its commissioning date.
    3. Add serial numbers and photos to your site checklist as mandatory fields.

    Part of the guide Running a solar EPC business on connected systems.

    Claims check
    Show us five rejected or delayed claims. We will show you which field caused each.
    Talk to us

    Subsidy amounts, vendor requirements and workflow: SurgePV, PM Surya Ghar guide for EPCs, a vendor source that discloses a commercial relationship with an installer. ALMM List-II clarification: SolarQuarter, 7 July 2026, reporting an MNRE memorandum dated 6 July 2026. Scheme size and household figures: Financial Express. These are secondary sources; the official scheme portal and MNRE notifications govern. The tracker design is our own model.

    Your verdict
    Was this article useful?
    GC
    Written by
    GarunaCDX Editorial
    Editorial team

    Engineers, product and growth folks at GarunaCDX writing about the systems we build for clients.

    View all articles
    Share
    Planning something similar?

    Let's talk about your build.

    Tell us what you are building. A founding engineer replies within one working day with how we would approach it.

    FAQ

    Frequently asked questions

    As reported by an EPC-focused guide: Rs 30,000 per kW up to 2 kW (Rs 60,000), plus Rs 18,000 for the third kW, so Rs 78,000 at 3 kW, with no additional subsidy above 3 kW. Confirm current amounts on the official scheme portal.

    As reported, the central assistance is paid by direct bank transfer after commissioning and the portal claim. Check how your contract treats subsidy timing, because the customer's cash position affects when you are paid.

    Modules must be on ALMM List-I and inverters need BIS certification. The same guide reports ALMM List-II cells as mandatory for projects commissioned on or after 1 June 2026, and MNRE issued clarifications on applicability in July 2026. Verify with MNRE for your project type.

    Typically mismatched details across uploads (consumer number, serial numbers, bank details), missing photos, installing out of sequence, or inspection backlogs. These are data-quality problems an EPC can prevent.

    The GarunaCDX build log